๐๏ธ Ward 6 Projects
Key areas we are actively working on for Stittsville: infrastructure, traffic, transit, community safety, seniors, trust and fiscal accountability.
๐๏ธ Stittsville Infrastructure Solutions
What we are adding, and how every addition is tested against Value Engineering and our four stage process.
Why This Matters
Stittsville is growing quickly. New homes and new residents put real pressure on roads, transit, drainage, water systems, businesses, public services and community infrastructure. Every addition we make needs to be planned for the whole community, not approved one project at a time.
What Do We Mean by Value Engineering?
Before anything is added, we ask whether it delivers the right result, at the right quality, with the right design and the best long term value for taxpayers.
Lowest price is not always the best value. Smart value means quality, function, durability and long term cost.
Every Addition Goes Through Four Stages
The same four stage process behind our full Plan of Action applies to every piece of infrastructure we add.
Planning
Brainstorming with residents and subject matter volunteers before anything is drawn on paper.
Design
Reviewing traffic, transit, drainage, capacity and community impact so the design fits the bigger picture.
Construction
Delivering quality, safety and long term value, with clear communication throughout the build.
Maintenance
Protecting the investment with preventive maintenance, repairs and long term operating plans.
๐ฆ Stittsville Traffic Solutions
Under research right now, focused on the streets residents raise most often.
Streets Under Review
We are currently researching traffic conditions and safety on five key Stittsville corridors:
- ๐ฃ๏ธ Stittsville Main Street
- ๐ฃ๏ธ Huntmar Road
- ๐ฃ๏ธ Abbott Road
- ๐ฃ๏ธ Cope Drive
- ๐ฃ๏ธ Fernbank Road
What We Are Looking At
๐ง Speed Bumps
Evaluating targeted speed bumps on residential stretches where speeding is a documented concern.
๐ฆ Speed Display Signs
Signs that show drivers their real time speed to encourage slower driving on residential streets. The goal is awareness, not revenue.
โ๏ธ Automatic Notices
When a vehicle is recorded speeding, the registered owner would receive an automated email or mailed notice so they are aware and can adjust, rather than being ticketed.
๐ Busy Road Research
Broader data collection on the busiest Ward 6 roads to identify where safety improvements should be prioritized next.
This work is under research and has not been finalized. Any measures adopted would need to meet applicable City by laws, traffic engineering standards and privacy requirements.
๐ Stittsville and West End Corridor Transit Solutions
A faster, smarter and more connected transit system for Ward 6.
The Challenge
Stittsville and West End Corridor residents deserve transit that gets them to work, school, healthcare, shopping and community services without spending ninety minutes to two hours travelling across Ottawa. Residents are telling us about long travel times, overcrowded buses, unreliable connections, difficult commutes downtown, limited options for students heading to Carleton University and other schools, and weak local connections between Stittsville neighbourhoods and major destinations. Adding more full size buses alone may not be the most efficient answer. We need to use transit dollars smarter.
Our Solution: A Layered Transit Model
1. Strengthen the Main Bus Network
Work with OC Transpo to add targeted capacity during peak periods on the routes with the greatest demand, prioritizing downtown commuters, students, employment centres and major connections. More capacity, fewer overcrowded buses, shorter waits, more reliable service.
2. Stittsville and West End Corridor Community Connector
A shared, hub to hub service connecting roughly ten strategic points across Stittsville, the West End Corridor and nearby Kanata, such as shopping areas, community centres, healthcare facilities, employment areas and Park and Ride locations, targeting service about every fifteen minutes during peak demand. Think of it more like a shared carpool vehicle than a full size bus, picking passengers up directly from regular bus stops and designated hub locations, and clearly marked with a City Transit Service decal so residents recognize it as an official part of the transit network.
3. Stittsville and West End Corridor Rapid Connector
A peak period rapid connection from selected hubs to major transit links and employment destinations, piloted mornings from 8:00 a.m. to 10:00 a.m. and afternoons from 3:00 p.m. to 6:00 p.m., aiming for a measurable 30 to 40 minute travel time on high demand routes. The same shared vehicle approach would apply to trips downtown, to university campuses for students, and to other high priority locations where large numbers of residents work or commute in bulk.
4. Opportunities for Local Operators
Where City procurement and safety rules allow, contract qualified local transportation providers for smaller vehicles, creating local employment while adding flexible capacity.
5. One Integrated Experience
The Community Connector and Rapid Connector are designed to work with the existing OC Transpo network: one network, simple connections, no unnecessary transfer penalty.
How the Community Connector and Rapid Connector Would Actually Work
These are not meant to be full size buses. Picture them more like a shared cab or carpool vehicle, picking up several passengers at once from regular bus stops and designated hub locations across the neighbourhood. Each vehicle would carry a clearly visible City Transit Service decal so residents immediately recognize it as an authorized, official part of the transit network, not a private ride share.
Fares would work the same way OC Transpo fares already work today. A rider taps their PRESTO card once when boarding, and is charged the same standard fare as a regular bus trip, for example around four dollars and fifteen cents for the Community Connector. The City would cover the remaining cost of that trip, the same way a portion of every existing bus ride is already subsidized by the City today.
The Rapid Connector would use this same tap once approach for trips to downtown Ottawa, university campuses such as Carleton and Algonquin for students, and other high priority locations where large numbers of residents work or commute in bulk. Because these trips tend to be longer, the fare could be set a little higher, for example around five dollars, with the City again covering the balance of the actual cost.
The value case is simple. When a Connector vehicle is carrying four or five passengers on a single trip, the City's cost per rider drops sharply, and the total subsidy needed is often far less than what it costs to run a full size bus covering that same route, especially outside the busiest hours. Residents get faster, more convenient service, and public transit dollars stretch further.
Fare amounts referenced here are illustrative planning examples based on approximate current OC Transpo pricing. Actual fares, subsidy levels, vehicle types and deployment would need to be confirmed through City transit planning, procurement rules, accessibility requirements and Council approval.
Smart Ideas to Strengthen This Model
๐ฑ On Demand Booking
A simple app or phone line for residents to request a Community Connector pickup during quieter hours, so vehicles run when and where they are actually needed instead of on a fixed schedule with empty seats.
๐ Right Sized Vehicles
Dispatch a smaller vehicle when demand is light and a larger van when demand is high, matching vehicle capacity to real ridership on every trip instead of running one size for every route.
๐ Student and Senior Passes
Discounted monthly passes for students commuting to university campuses and seniors travelling to medical appointments, layered on top of the standard tap once fare.
๐ ฟ๏ธ Park and Ride Timing
Connector schedules timed to meet Park and Ride lots and future rapid transit stations, so residents can park once and finish their trip without driving all the way downtown.
โณ Real Time Arrival Screens
Digital displays at major hubs showing exactly when the next Connector or bus is arriving, cutting down on guesswork and long waits in bad weather.
๐ Public Cost Per Rider Dashboard
Published ridership and cost per rider data for every Connector route, so residents can see, in real numbers, whether the model is truly saving money compared with adding more full size buses.
The Financial Strategy
The question should not simply be how many buses we can add. The better question is how we move more people, faster, with every transit dollar we spend. For planning purposes, if an additional full size bus were assumed to cost approximately five thousand dollars per operating day, four additional buses would represent about six hundred thousand dollars a month, or roughly seven point three million dollars a year. These are illustrative planning figures, not an OC Transpo quotation or an approved City budget. The proposal is to evaluate whether a combination of targeted full size buses, smaller community connectors and rapid connections delivers better service and value than relying only on additional full size buses.
Start With a Pilot: Do Not Build Everything at Once
Listen & Analyze
Collect real data on ridership, travel times, wait times, overcrowding, student and employment commuting, senior transportation needs, and origin and destination patterns.
Pilot
Launch selected main route capacity improvements, Community Connector routes and Rapid Connector routes.
Measure
Publish results on travel time, wait time, on time performance, ridership, cost per passenger and customer satisfaction.
Expand
Successful routes expand, underperforming routes are adjusted, and poor performing services are redesigned. Public money should follow results.
What Success Looks Like
Imagine a Stittsville and West End Corridor resident saying: “I know when my bus or connector is coming.” “I can reach my destination without spending two hours travelling.” “I do not have to drive because transit is finally convenient.” That is the standard we should work toward.
More Capacity
Where overcrowding is greatest.
Less Time
Shorter, more predictable journeys.
Better Connections
Between neighbourhoods and major routes.
Smarter Local Service
Smaller vehicles where they make sense.
Local Opportunities
Qualified local operators and employment.
Accessible Transit
Designed for seniors and accessibility needs.
Accountability
Results measured and reported publicly.
Stittsville and West End Corridor does not need promises. Stittsville and West End Corridor needs a transit plan that can be tested, measured and improved. Public investment tied to measurable results. Stittsville and West End Corridor deserves transit that works.
๐ค Trust Issues
Earning trust back takes more than words. Here is the process we are putting in place.
Monthly Town Halls
We are holding a town hall every month so residents have a standing, predictable place to raise concerns and hear direct updates, rather than waiting for an election cycle to be heard.
-
Concerns Get Collected
Every concern raised, whether at a town hall, by email, at the door or on the website, is logged.
-
Residents Get Notified
Residents are told which concerns we are actively working on and what the action plan looks like.
-
If a Concern Is Not Valid
We explain why at the next month’s town hall, so nothing simply disappears without a response.
-
Emails Get Answered
If a concern comes in by email, we respond within forty eight hours with an appropriate answer.
๐ก๏ธ SV Shield: Community Safety Reporting
SV Shield is a community safety reporting tool for Stittsville. Residents can report a non emergency safety concern, suspicious activity, theft or break in, property damage, vandalism, or an unsafe condition, in their own words, in any language, and have it logged for follow up. It is one more way we are making it easier for residents to be heard and to see that something is actually being done.
SV Shield is for non emergency reports only. For a life threatening emergency, always call 911 first.
-
Choose Your Language
Select your preferred language from the dropdown. SV Shield supports many languages spoken across Ward 6, including French, Punjabi, Hindi, Urdu, Arabic, Chinese, Spanish, Somali, Tagalog, Korean, Vietnamese, Portuguese, German, Amharic and Tamil.
-
Select the Incident Category
Pick the category that fits: suspicious activity, theft or break in, property damage, vandalism, unsafe conditions, or other.
-
Add Your Location
Enter the location or address where the concern is happening. This field is required so the report can be followed up on accurately.
-
Describe What Happened
Type your description, or tap the microphone to speak in any language. Your words are automatically translated to English, so language is never a barrier to being heard.
-
Attach Photos or Video
If you have them, attach up to four photos or a short video clip to support your report. This step is optional.
-
Review and Submit
Click Review Report, check that the text, including anything spoken and translated, looks correct, then confirm and submit.
SV Shield reports are non emergency. For anything urgent or dangerous, call 911. For non emergency police matters, Ottawa Police can be reached at 613 236 1222.
Our Commitment
We are working to regain the trust of our community, one concern, one update and one town hall at a time. No disappearing issues. No forgotten concerns.
๐ก๏ธ Community Safety
Ward 6 families and businesses deserve visible, reliable safety resources, not just a mention every four years.
Why This Matters
Stittsville is growing fast, and growth brings new pressure on public safety. Residents consistently tell us they want to see more police presence in their neighbourhoods, faster response times and a real partnership between the community and Ottawa Police Service, not just statistics on a report.
What We Are Pushing For
๐ฎ More OPS Funding
Advocating for increased Ottawa Police Service funding directed toward frontline patrols serving Ward 6, not just downtown priorities.
๐ More Police Patrolling
Regular, visible patrols in our neighbourhoods, near schools, parks, trails and business areas, so residents see safety, not just hear about it.
๐ก๏ธ SV Shield Reporting
Our community safety reporting tool lets residents flag suspicious activity, vandalism or unsafe conditions in their own language, in minutes.
๐๏ธ Neighbourhood Watch Support
Backing resident led watch groups with training, coordination and a direct line to City and police resources.
Safety is not a talking point once every four years. It is patrol cars residents actually see on their street.
๐ด Seniors
Built on years of hands on work inside retirement homes, not just a campaign promise.
Why This Matters
Mani has personally worked in retirement homes and senior care facilities, and his wife has spent over twenty years in senior care, including right here in Stittsville. Seniors built this community, and they deserve a councillor who understands their daily needs from lived experience, not from a policy binder.
What We Are Adding for Seniors
๐ ฟ๏ธ Free Parking for Senior Veterans
Free parking at City lots for senior veterans whose licence plate displays the Veteran logo, as a small thank you for their service.
๐ Better Para Transpo Service
Pushing for shorter booking windows, more reliable pickup times and priority scheduling for medical appointments.
๐ฅ More Senior Facilities
Expanded programming, activity space and social opportunities at Stittsville senior centres and retirement communities.
๐ฉบ Wellness Check Programs
Supporting regular wellness check programs for seniors living alone, so no one falls through the cracks.
๐ธ Safe Crosswalks
Accessible sidewalks and safe crosswalks near retirement communities, designed with seniors and mobility devices in mind.
๐๏ธ Town Halls at Residences
Quarterly town halls held inside senior residences, so getting there is never a barrier to being heard.
โ๏ธ Reliable Snow Clearing
Priority snow clearing on pedestrian routes near senior housing, every winter, without exception.
๐ Senior Focused Transit
Transit routes and schedules that actually connect seniors to medical appointments, grocery stores and community centres.
Seniors deserve dignity, not just a mention in a campaign speech. This plan comes from years spent in the rooms where it matters.
๐ Fiscal Accountability
Every dollar collected from Ward 6 residents should be explained, not just spent.
Full Transparency on Spending
The City should account for every dollar it collects and every dollar it spends, in plain language residents can actually read. We will push for a clear public breakdown of collections and expenses, with justification attached, so taxpayers can see exactly where their money goes and why.
The LRT Problem
Our transit system has struggled for years, yet the City keeps directing funding toward the LRT project despite repeated breakdowns, delays and reliability issues. Money should not keep flowing to a project that has not delivered for riders while core services in wards like ours are stretched thin. Funding decisions need to be tied to actual results, not sunk cost.
Taxes Up, Services Down
Over the past several years, property taxes have gone up, in part to help close City budget shortfalls, while services residents rely on have been reduced, including tighter garbage collection limits and cuts elsewhere. Ward 6 residents are paying more and getting less, and that trend needs to be reversed.
Stittsville taxpayers deserve a City that spends like every dollar is someone’s paycheque.
